INDUSTRIAL PROJECTS

GRAPHIC PACKAGING INTERNATIONAL

  • Location: Shelbyville, IL
  • Project Category: Industrial
  • Project: Facility Improvements; Facility Maintenance
  • Description:
    • New Office Space – Curry Construction converted an existing storage closet and bathroom entrance into new office space.
    • New Lid Line – This project involved unloading a conveyor, an extruder and a Gorbel. Our team removed the existing conveyor and installed a new conveyor. The client requested relocation of the guard rail, tool crib and accessories. Our team also set the extrude, the packing station, the lid cutter and the case erector.
    • Fire Suppression System – This project involved installation of a new FM200 fire suppression system in the new press electrical room with a subfloor.
    • Relocate Lid Lines – Curry Construction relocated two of the client’s lid line units from one building to another building. The team also changed the conveyor system, so the lid lines could be removed.
    • 717 Press – This project included relocating the existing press and installing a new press in the customer’s facility.
    • Corrective & Preventative Maintenance