Project
Building Construction
Description
Curry removed the existing dock and parking lot and completed topsoil and other site work. This project involved the formation and pouring of approximately 45,000-square-feet of 8” thick exterior concrete and 52,200-square-feet of 6” thick concrete floor slab with wire mesh reinforcement and other concrete work. We also furnished and erected a 200’ wide x 249’ long pre-engineered steel building, 24’ wide x 38’ long and 38’ wide x 38’ long pre-engineered connector corridors, and a 55’ wide x 60’ long pre-engineered steel building for trailer storage.