Reno, NV; Fort Smith, AR; Thompson Station, TN; Mattoon, IL

Project
Building Expansion and Improvements

Description

Extruder Room Piping Installation; Reno Nevada

Curry Construction demolished existing lines and installed new Schedule I 0-304 stainless steel piping with single-pass welds.

Process Piping Fort Smith, Arkansas

We were contracted to remove and install process piping throughout the customer’s facility in Fort Smith, Arkansas.

New Breakout Room; Thompson Station, Tennessee

We constructed a new breakout room with outlets, appliances, water lines, and air duct included.

Warehouse Expansion; Mattoon, IL

This project involved building a warehouse expansion at the customer’s facility in Mattoon, Illinois. The scope of work included demolition, concrete, masonry, roofing, and painting.

Dentastix Tower; Mattoon, IL

We constructed the Dentastix Tower at the customer’s facility in Mattoon, Illinois.

KKM Red Lab; Mattoon, IL

This project is for the addition of a Red Lab at the Mars location in Mattoon, Illinois. The project consists of a 26 ft. x 78 ft. block truck sampling bay. There is also a dry ingredient testing laboratory that is 37 ft. by 48 ft. Some other aspects of the project include a new above-ground truck scale, a new road entrance, and pouring new concrete for the truck entrance into the new truck sampling bay.